Flow sequence of merchandising section:
- Received PDF sheet.
- Consumption.
- Costing.
- Negotiation with buyer.
- Order received.
- Purchase order sheet received.
- L.C opening.
- Purchase fabric & accessories.
- Time and action setting.
- Approval for bulk production.
- Related work to production planning.
- Start bulk production.
- Inspection.
- Handover to buyer nominated agents.
Work done by Merchandiser:
- Sourcing.
- Pricing (CM,C&F,CIF,FOB).
- Order follow up and execution.
- Arranging final inspection.
- Ensuring on time shipment.
List of Accessories:
1) Sewing thread and sew able item
- Thread.
- Button.
- Main label.
- Size label.
- Care label.
- Velcro (Hook and loop fastener).
- lace.
2) Finishing item:
- Price ticket.
- Hang tag.
- Poly bag.
- Back board.
- Neck board.
- Collar inside.
- Butter fly (Single, Double).
- Tag pin.
- Tissue paper.
- Draw string and stopper.
They do it during running the production. As a result if any fault occurring it rectified in the primary stage.
Arranging final inspection:After completion the garment making merchandiser arrange final inspection date with quality department. Inspection is also depending on the wishes of buyer.
Ensuring on time shipment:Once the inspection is done and the goods found ok for shipment, then the goods handed over to the clearing and forwarding agent for on time shipment.